CHURCH RENOVATION

PHOTOS - WEEK 56

August 20 - August 26, 2017

WEEK  56

Week 56 was all about painting.  With the ceiling and wall painting complete lighting fixtures are being hung.  You’ll also notice railings were installed on the tower and the siding was replaced with a “shingle” style siding which looks more vintage.  Inside, cleanup continues in preparation to tile the addition in Week 57.  Outside, drain lines for the gutters will be installed as well as the removal of the construction trailer.

Week 56– Accomplishments

  • Ceiling and wall painting complete.
  • Railings installed on Tower.
  • Tower siding replaced with “shingle” style siding.
  • Begin hanging light fixtures.

Week 57 – Goal

  • Finish hanging lighting fixtures.
  • Decommission construction trailer.
  • Begin tiling in addition.