Week 55 saw the completion of ceiling tile installation as well as painting of the ceiling.  Getting the ceiling near completion is another benchmark with the project as well as completing the sidewalks in the back area.

Week 56 will see more activity outside as they begin to form the sidewalks and front patio area.  A special “benchmark” will be the installation of the railings on the Tower north and south sides.  We should also see much of the painting done in the church body so we can make way for the completion of the tile floor in the addition area in the next 2 weeks.

Check out our lengthy “Project Tour – Week 55” video on our website.

Week 55– Accomplishments

  • Ceiling tiled and painted.
  • Ceiling over old choir loft repaired and painted.
  • Sidewalks and stair landings in back completed.

Week 56 – Goal

  • Complete ceiling with install of medallions.
  • Install railing on tower.
  • Form front sidewalks and patio area.